Here you can download all Requests for the issuance of approvals for connection:
- Connecting to the grid
- Connecting to the grid
- Requests for the issuance of approvals for connection (for standard connection)
- Requests for the issuance of approvals for connection (for unstandard connection)
- Requests for the issuance of approvals for connection (for temporary objects and building sites)
- Requests for the issuance of approvals for connection (for lowering or increasing power, separating installations...)
- Requests for the issuance of approvals for connection (whose category of consumption is changing)
- Requests for the issuance of approvals for connection (for electro-energetic objects)
- Request for installation of the measuring device and the temporary connection of a facility (Add. Test with a statement about ta
- Request to conclude a contract on the connection to the distribution system
-
11.12.23
Public Invitation for EPCG-Željezara Nikšić
-
26.07.23
DJUKANOVIC: PERSPECTIVES ON ELECTRICITY GENERATED BY SOLAR POWER PLANTS AS PART OF SOLARI 3000+ AND 500+ PROJECT
-
28.10.22
XXV EXTRAORDINARY EPCG SHAREHOLDERS’ MEETING TOOK PLACE
-
28.10.22
FROM THE PROFESSIONAL POINT OF VIEW: EPCG IN THE CONTEXT OF THE GLOBAL ENERGY CRISIS
- Home
- Requests for the issuance of approvals for connection